Markets and Remuneration in Catalyst

Catalyst supports the simulation of renewable energy projects across multiple European markets. By integrating country-specific market rules and remuneration schemes, it helps you evaluate potential revenues and operational strategies with high precision.


Overview of Power and Capacity Remuneration

Europe offers a wide variety of remuneration schemes for energy generation and flexibility services. These schemes define how projects can earn revenue and the technical requirements needed to participate. Catalyst models these schemes to provide realistic revenue forecasts.

Below is a general overview of the most common remuneration schemes:

SchemeRemunerationTechnical Requirements
Feed-in Tariff (FiT)Fixed €/MWh tariff; guaranteed income< 100 kWp; registered in support scheme; basic metering
Contract for Difference (CfD)Strike price from auction; paid difference vs. market>500 kWp or MW-scale; auction participation; BRP contract
Day-Ahead / Intraday Wholesale TradeMarket price €/MWh (SDAC/SIDC)>100 kWp; schedule submission; BRP responsible; metering + remote control
Power Purchase Agreement (PPA)Contracted €/MWh (fixed or indexed); 5–15 years typicalUsually >1 MW; forecasting capability; BRP/imbalance settlement
FCR (Frequency Containment Reserve)Capacity €/MW + activation €/MWh≥1 MW; symmetric ±; 1–4h blocks; TSO prequalification; fast response
aFRR (Automatic Frequency Restoration Reserve)Capacity €/MW + activation €/MWh≥1 MW; < 30s activation; 15-min blocks; symmetric & asymmetric; TSO prequalification
mFRR (Manual Frequency Restoration Reserve)Capacity €/MW + activation €/MWh≥1 MW; < 15min activation; 15-min blocks; TSO prequalification
RR (Replacement Reserve)Capacity €/MW + activation €/MWh≥1 MW; 30–60min activation; 1h asymmetric blocks; TERRE until 2025
Capacity Market€/MW/year for availability; penalties for non-delivery≥1 MW; prequalification; availability proof during stress periods
Redispatch / Curtailment Compensation€/MWh for curtailed energy (market price or regulated)>100 kWp; remote control capability; registration as redispatch unit
Flexibility Markets / Local Energy Communities€/MW or €/MWh; local tariffs/auctionsSmall scale (kW via aggregation); smart meters; controllable devices

Countries Supported in Catalyst

Catalyst currently supports a wide range of EU countries, each with unique market designs and regulatory structures. The table below shows where Catalyst can simulate different market segments and balancing services.

Legend:
= Supported
(✓) = Partial or planned support
= Not available

CountryCatalyst SupportDA (SDAC)ID (SIDC + IDA)Capacity Market / MechanismFCR ParticipationFCR Block (h)FCR Sym/AsymFCR Reserved Capacity (notes)aFRR ParticipationaFRR Block (min)aFRR Sym/AsymaFRR Reserved Capacity (notes)mFRR ParticipationmFRR Block (min)mFRR Sym/AsymmFRR Reserved Capacity (notes)
AustriaEnergy-only4symFCR-Coop daily auctions; national share15sym + asymPICASSO; national tenders15sym + asymMARI + RR: –
BelgiumCRM (T-4/T-1)4symFCR-Coop daily auctions; national share15sym + asymPICASSO; national tenders15sym + asymMARI + RR: –
BulgariaEnergy-only4symNational/regional; not in FCR-Coop15sym + asymPICASSO; national tenders15sym + asymMARI + RR: –
CroatiaEnergy-only4symNational/regional; not in FCR-Coop15sym + asymPICASSO; national tenders15sym + asymMARI + RR: –
CyprusStart 15-09-2025(✓)No mechanism (state-run/planned)
CzechiaEnergy-only4symFCR-Coop daily auctions; national share15sym + asymPICASSO; national tenders15sym + asymMARI + RR: ✓ (TERRE, 1h, asym; until 2025-12-31)
DenmarkEnergy-onlyDK1: 4 / DK2: 1symSeparate synchronous areas (West/East)15sym + asymPICASSO; national tenders15sym + asymMARI + RR: –
EstoniaEnergy-only1symNordic/Baltic sizing; national tenders15asym (Up/Down separate)Nordic aFRR; PICASSO integration15asym (Up/Down separate)Nordic mFRR; MARI + RR: –
FinlandStrategic Reserve1symNordic sizing; national tenders15asym (Up/Down separate)Nordic aFRR; PICASSO integration15asym (Up/Down separate)Nordic mFRR; MARI + RR: –
FranceCapacity Mechanism4symFCR-Coop daily auctions; national share15sym + asymPICASSO; national tenders15sym + asymMARI + RR: ✓ (TERRE, 1h, asym; until 2025-12-31)
GermanyStrategic/Network Reserve4symFCR-Coop daily auctions; national share15sym + asymPICASSO; national tenders15sym + asymMARI + RR: –
GreeceCRM (in implementation)4symNational/regional; not in FCR-Coop15sym + asymPICASSO; national tenders15sym + asymMARI + RR: –
HungaryEnergy-only4symNational/regional; not in FCR-Coop15sym + asymPICASSO; national tenders15sym + asymMARI + RR: –
IrelandCRM (SEM)Own SEM productsNational/regionalOwn SEM productsSEM design (POR/SOR/TOR)Own SEM productsSEM design (TOR1/TOR2)
ItalyCapacity Market4symNational/regional; not in FCR-Coop15sym + asymPICASSO; national tenders15sym + asymMARI + RR: –
LatviaEnergy-only1symNordic/Baltic sizing; national tenders15asym (Up/Down separate)Nordic aFRR; PICASSO integration15asym (Up/Down separate)Nordic mFRR; MARI + RR: –
LithuaniaEnergy-only1symNordic/Baltic sizing; national tenders15asym (Up/Down separate)Nordic aFRR; PICASSO integration15asym (Up/Down separate)Nordic mFRR; MARI + RR: –
LuxembourgEnergy-only4symNational/regional; not in FCR-Coop15sym + asymPICASSO; national tenders15sym + asymMARI + RR: –
Malta(✓)(✓)No mechanism (state-run/planned)
NetherlandsEnergy-only4symFCR-Coop daily auctions; national share15sym + asymPICASSO; national tenders15sym + asymMARI + RR: –
PolandCapacity Market1symNational, not in FCR-Coop15sym + asymPICASSO (since 2025-07-11); national15sym + asymMARI; national products + RR: –
PortugalEnergy-only4symNational/regional; not in FCR-Coop15sym + asymPICASSO; national tenders15sym + asymMARI + RR: ✓ (TERRE, 1h, asym; until 2025-12-31)
RomaniaEnergy-only4symNational/regional; not in FCR-Coop15sym + asymPICASSO; national tenders15sym + asymMARI + RR: –
SlovakiaEnergy-only4symNational/regional; not in FCR-Coop15sym + asymPICASSO; national tenders15sym + asymMARI + RR: –
SloveniaEnergy-only4symFCR-Coop daily auctions; national share15sym + asymPICASSO; national tenders15sym + asymMARI + RR: –
SpainCapacity Market (planned/implement)4symNational/regional; not in FCR-Coop15sym + asymPICASSO; national tenders15sym + asymMARI + RR: ✓ (TERRE, 1h, asym; until 2025-12-31)
SwedenStrategic Reserve1symNordic sizing; national tenders15asym (Up/Down separate)Nordic aFRR; PICASSO integration15asym (Up/Down separate)Nordic mFRR; MARI + RR: –

How Catalyst Uses This Data

By integrating these market features, Catalyst allows you to:

  • Compare market participation strategies across countries.
  • Simulate asset revenues under different remuneration schemes.
  • Plan asset sizing and bidding strategies for energy and ancillary services.
  • Stay aligned with evolving European market rules.